Concrete

20131031-121935.jpg

The form awaiting concrete this morning. This is the form over the new well. After this sets we will build a well house and install the well pump, lines, pressure tank, charge controller, batteries, and solar panels. With all that, we should have water.

20131031-122203.jpg

Here we have just finished, almost, the pour for the cistern. I say almost because somehow we came up a yard short and are now awaiting the truck to come back with more concrete.

Leave a Reply

Your email address will not be published. Required fields are marked *